aqualtis Home › Forums › Trade Technical & Spare Parts Forums › Trade Technical Enquiries › aqualtis This topic has 1 reply, 2 voices, and was last updated 16 years, 5 months ago by robbo1973. Viewing 2 posts - 1 through 2 (of 2 total) Author Posts October 27, 2009 at 6:56 pm #49659 robbo1973Participant i am fitting a new tub assy to one of these on monday having never done one before are they out the front or the top and roughly how long should it take? cheers chris October 27, 2009 at 7:01 pm #300611 lerchParticipant Re: aqualtis Out the top about 30-40 minutes. Author Posts Viewing 2 posts - 1 through 2 (of 2 total) You must be logged in to reply to this topic. Log In Username: Password: Keep me signed in Log In