Re: AWCT10L Bearing job.
Fairly straight forward, top off, facia off, bottom plinth off, door seal unclipped, remove door interlock, front off. (Now this bit makes it alittle easier to do – drill a hole at the top of the drum pulley recess on the back of the rear casing – then using a hole cutter cut an inch and a half hole in the casing – this gives you access to the drum pulley retaining nut) lock pulley and remove nut and washer. Round to the front, take off wires to heater/thermistor, remove two counterweights and then undo ye number of tubfront screws. Take tubfront off disconnecting pressure switch pipe as you go – You are now in, drum pulley off tub out and you have access to bearing/seal assy. The bearing and seal kit is the same as that used on the Hotpoint 95/WM series. Reassembly is the reverse checking the normal and then finally blank off the hole you cut at the start. Good luck